Customer request
Please repaint the study, including the woodwork, before the furniture delivery.
Catch the question before it becomes an assumption.
Two fictional quote-review exercises for small-contractor teams. Practice separating written inclusions from unresolved boundaries, not judging trade competence.
Synthetic training only. Not legal, contract, trade, safety or estimating advice. A score does not certify competence or contract completeness. No real-project or contractor validation is claimed.
Please repaint the study, including the woodwork, before the furniture delivery.
Paint the four study walls with two finish coats. Prepare surfaces as needed. Use the customer-selected light neutral. Woodwork to match. Work planned for Friday.
Could we use the deep blue instead, and include the door too? The furniture now arrives at noon Friday.
Study repaint, including woodwork and door, at the previously quoted total. Friday completion remains planned.
Stop timing first. Tick only boundaries supported in your initial notes. Each point needs both a cited passage and a clarification question; reading this key is not an initial-review success.
Prepare surfaces as needed.
Ask: Which repairs and preparation steps are included, and what condition triggers a separate agreement?
Text supports: Preparation is mentioned; its extent is not defined.
Use the customer-selected light neutral.
Ask: Does the revised scope confirm deep blue, and are extra coats or materials included if needed?
Text supports: Two finish coats are stated for the original wall scope; deep-blue coverage is not resolved.
Woodwork to match.
Ask: Which woodwork pieces, faces and finishes are included, and what does match mean?
Text supports: Woodwork is named, but its item list and finish are unspecified.
including woodwork and door
Ask: Which door, which faces, frame and edges are included?
Text supports: A door is included in the revision, not an identified set of surfaces.
The furniture now arrives at noon Friday.
Ask: Is completion required before noon, and what access or drying-time arrangements are agreed?
Text supports: Friday is planned; a before-noon commitment is not established.
at the previously quoted total
Ask: Has the revised colour, door work and preparation basis been accepted by both parties at this total?
Text supports: The revision states a total basis, but no acceptance message or detailed changed-work price basis is supplied.
Fit a simple closet in the spare-room recess, with hanging space and shelves for storage bins.
Supply and fit a standard closet unit to the recess. Include one hanging rail and shelves to suit. White finish. Installation on Tuesday, subject to room readiness.
Please make space for the tall bins and use soft-close doors. There is a socket behind the old unit; can you deal with that while you are here?
Closet unit with rail, shelves and soft-close doors. White finish as discussed. Tuesday installation. Electrical work excluded.
Stop timing first. Tick only boundaries supported in your initial notes. Each point needs both a cited passage and a clarification question; reading this key is not an initial-review success.
a standard closet unit to the recess
Ask: What measured unit and recess dimensions, clearances and infill are agreed?
Text supports: A unit and recess are identified, but dimensions and fitting tolerances are not.
shelves to suit
Ask: How many shelves, at which heights, and what tall-bin dimensions must the layout accommodate?
Text supports: Shelves are included, but their count, positions and bin clearances are unresolved.
soft-close doors
Ask: What door count, configuration, hardware and opening clearances are included?
Text supports: Soft-close doors are included; their detailed specification is not established.
White finish as discussed.
Ask: Which surfaces and components receive which white finish, and is any site touch-up included?
Text supports: White is stated; the finish system and covered surfaces are not documented.
Electrical work excluded.
Ask: Who arranges any socket work, and must it be completed before fitting without obstructing access?
Text supports: Electrical work is expressly excluded; coordination and readiness remain unresolved. Do not treat it as included.
Installation on Tuesday, subject to room readiness.
Ask: What constitutes room readiness, including removal of the old unit, and is Tuesday still conditional?
Text supports: The original date is conditional. The revision supplies a date but does not expressly resolve readiness or removal.
Self-reported initial-review score: 0 / 12